Skip to main content
Sunday, December 22, 2024 | Home

Announcements

Posted: Wednesday, June 23, 2021

Partial Closure of Rockwell Road: June 28-July 2

Asphalt repairs to a portion of Rockwell Road are scheduled to begin Monday, June 28, and continue through Friday, July 2, weather permitting. The repairs will occur on the northern (westbound) portion of Rockwell Road near Lot R-12, Lot R-13, and the Student Apartment Complex.

Traffic exiting Rockwell Road will not be permitted to turn onto Grant Street in either direction during the construction period. Vehicles will be directed to detour through Lot R-12 and Lot R-13 to Rees Street. At Rees Street, drivers will be required to turn right (northward) toward Coyer Field and exit onto Grant Street near Lot G-24, or at the Coyer Field Entrance.  

Thank you for your cooperation as we make these necessary repairs.

Campus map (PDF, 4.3 MB)

Submitted by: Jill Powell
Also appeared:
Thursday, June 24, 2021
Friday, June 25, 2021
Loading