Skip to main content
Wednesday, November 27, 2024 | Home

Announcements

Posted: Friday, August 28, 2020

Iroquois Drive Temporary Road Closure Begins Today: Parking Lots Remain Open

Iroquois Drive will be closed from the Coyer Entrance to the west driveway of Lot I-39 starting today, August 28, through Friday, October 16, to accommodate reconstruction of the roadway (campus map, PDF, 4.3 MB). During this time, when through traffic on Iroquois Drive cannot be maintained, drivers will be directed to use Rockwell Road. A two-way detour to Rockwell Road has been posted.

All parking lots along Iroquois Drive will remain open during this time. Drivers wishing to access these lots should enter Iroquois Drive from Elmwood Avenue.

The Iroquois Drive reconstruction project is replacing the deteriorated roadway and drainage system. It will provide additional sidewalks for pedestrian use, high-visibility crosswalks, and LED site lighting.

Thank you for your patience as this important construction project continues. Questions may be e-mailed to vpfm@buffalostate.edu.

Submitted by: Jill Powell
Loading