Announcements
Posted: Friday, August 18, 2023Air Handler Replacement Project: Student Union - August 22
A boom truck will be in the Student Union Plaza on Tuesday, August 22, from 7:00 to 9:00 a.m. to lift equipment for the air handling unit replacement project at the Campbell Student Union.
The area will be marked with tape and cones, and construction personnel will be present to indicate the extent of the lift safety area and to make sure no unauthorized people are present within this area.
Please call Joe Fuchs, engineering manager in Facilities Design and Construction, at (716) 878-5108 with questions.